Best by project · Based on the 2021 IRC; your local code may differ

Best Spray Foam Insulation for Metal Buildings

The first inch is bought to stop condensation. R-value is what you buy after that.

Product examples · not ranked

The products on this page

  1. DuPont Froth-Pak 630 Foam System product photoDuPont Froth-Pak 630 Foam SystemSee it on Amazon
  2. HandiFoam FR (HFO) II-200 and II-600 product photoHandiFoam FR (HFO) II-200 and II-600See it on Amazon
  3. Akfix ThermCoat 24-Pack product photoAkfix ThermCoat 24-PackSee it on Amazon
  4. Magic Chems Spray Foam Insulation Kit 24-Pack product photoMagic Chems Spray Foam Insulation Kit 24-PackSee it on Amazon
  5. TYTAN Professional Thermospray Kit product photoTYTAN Professional Thermospray KitSee it on Amazon

As an Amazon Associate I earn from qualifying purchases.

This page is about a pre-engineered steel building: a steel frame with steel purlins and girts, and the panel screwed straight to them, so there is no cavity at all and nothing between the inside air and the outside metal. A post-frame pole barn is wood framing under the same kind of skin and the arithmetic is different enough to be its own page, so it has one. Here the foam goes on the inside face of the skin, sprayed between the framing and, if the budget allows, over it.

Condensation is why foam wins this job rather than batts, and it is worth being exact about when it happens. Water forms where the panel is colder than the dew point of the air touching it. Two things get it there. On a clear, still night the roof radiates to the sky and falls several degrees below the outside air, which is the case everyone describes. The one that actually soaks most buildings is duller: an unsealed slab, bare ground, a vehicle brought in wet or an unvented propane heater puts moisture into the air, and it meets a cold panel on any winter day. Dry air against a cold panel does nothing at all, which is why sealing the floor matters as much as anything you spray.

The traditional answer is a faced fiberglass blanket laid over the purlins, and it fails in ways that have little to do with someone tearing it. It is punctured by the roof screws at installation, by design. It is crushed to almost no R-value where it is pinched between the purlin and the panel, which is itself part of why the cold lines appear along the framing. And air leaks at the laps. Closed cell foam sprayed onto the panel removes the air path and lifts the inside face of the assembly above the dew point, which is two mechanisms rather than one. It does that where it is continuous and actually stuck: a panel that is oily, rusty or loosely coated is where adhesion fails and the path comes back. How much vapor moves through after that is a number the maker publishes, and HandiFoam FR prints 0.9 perm at 1 in on its data sheet.

Then there is the size of it. A modest 30 by 40 ft building with 14 ft walls has about 3,000 sq ft of surface to cover. That is ten times a rim joist and three times a basement, and it is the number that decides whether you are buying kits or calling a contractor.

Assembly, moisture and code planning for this job is at our sister publication under common ownership: Metal-building condensation and enclosure planning, at Spray Foam Guides. This page stays with exact products and the records their makers publish.

The assembly decides the product

What decides the product before you pick a brand

Condensation first

The first inch or two of closed cell foam is bought to keep humid air off cold steel, not to hit an R-value. How thick that has to be depends on how warm and humid you keep the inside and how cold it gets outside, so it is a calculation rather than a number someone can hand you. What the makers publish, and what you compare, is the perm rating at a stated thickness.

The frame keeps conducting, if it is steel

In a pre-engineered building the purlins and girts are steel and they run from the inside face to the outside skin. Spraying between them insulates the bays and leaves the frame conducting straight through, which is what draws the cold lines people photograph on a metal ceiling in winter. Covering the framing means spraying over it, which adds depth across the whole building and is where the cost goes. A post-frame barn with wood girts does not have this problem to the same degree, because wood conducts a small fraction of what steel does.

Three different temperatures, and only two are published

The working ranges on these sheets are ambient and can temperatures, not substrate temperatures, and they are not one number. Most one-component sheets we hold top out around 86 F, Loctite goes to 95 F, Great Stuff states 60 to 90 F, DAP reaches 120 F and the BEEST kit asks for 68 to 77 F. On the canister side HandiFoam asks for core chemical at 75 to 85 F while Froth-Pak asks only for tank contents at 75 F or warmer. What none of them publishes is a limit for the surface you are spraying onto, and a south-facing steel wall in July is hot enough to change how the foam rises and sticks. Read the range on the product you buy, and treat a hot skin as a reason to move to the shaded side or the early morning.

Which code applies is a real question

The IRC governs one- and two-family dwellings. A barn, a shop or a storage building is not a dwelling, so the code that applies is the IBC, and many states exempt agricultural buildings from the building code entirely while still applying zoning and electrical rules. Ask the official which one covers your building before you plan around any section on this page. The answer changes the day the building becomes living or working space.

What the code says

The provisions that apply, and the numbers they use

Section numbers are from the 2021 International Residential Code. Your city or county adopts one edition of the code and changes parts of it, and your local building official has the final word. A thermal barrier and an ignition barrier are different things, and the glossary explains both.

IRC R316.4Where the building is a dwelling, foam plastic must be separated from the interior by a thermal barrier of 1/2 in gypsum board, 23/32 in wood structural panel, or a material that meets the acceptance criteria of both the temperature transmission fire test and the integrity fire test of NFPA 275. A barndominium is a dwelling.
Not the IRC: IBC Chapter 26, Section 2603For a building the IRC does not cover, the foam plastic rules live in the IBC instead, built on the same idea of a thermal barrier between the foam and the interior, with its own set of exceptions. Which exception a shop or a barn falls under is a question for the building official, not one to answer from a web page.
IRC R316.6Specific approval: foam plastic may be used without the prescriptive barrier where the assembly is approved on the basis of an end-use test such as NFPA 286, FM 4880, UL 1040 or UL 1715. HandiFoam publishes ICC-ES ESR-2717 and DuPont cites ESR-3228 for Froth-Pak, and both reports can be opened and read. A report covers only the product, thickness, substrate and geometry it names.
Energy code, commercial chapterA conditioned metal building is not sized from the residential table. The commercial energy chapter carries its own metal building assembly types, filled cavity and continuous insulation, with different values from a wood-framed wall. If the building will be heated or cooled, that is the table to read.

Products that document this job

What the tracked products say about it, in their own documents

Listed by product family. Each line says why the product is on this list, always from something the maker published. Follow the link for the documents, the questions still open, and dated prices.

Canister systems

  • Froth-Pak 630 630 sq ft at 1 in per kit, at $1.57 a square foot on the listing we track, which is the figure that matters at this scale. The Vega Bond and Stanley canisters are cheaper per stated square foot on their store prices; both were out of stock on September 8, which is why this is the one to start from rather than the cheapest number on the page.
  • HandiFoam FR (HFO) II-600 The only kit here that prints a perm rating, 0.9 at 1 in, which is the number a condensation decision actually turns on. Aged R-6.4 at 1 in and an ICC-ES report as well. Its own sheet says FOR PROFESSIONAL USE ONLY in capitals and names a powered air purifying respirator, which is part of the product.

Single-can kits

  • Akfix ThermCoat Names metal buildings in its own list of uses, alongside walls, roofs, attics, basements, rim joists and ducts.
  • Magic Chems kit Names metal buildings and workshops on its own list of uses. It states 20 sq ft a can at one inch in the calculator on its own store, and that figure sits in page copy with no sheet behind it. Its 2-can and 3-can foam packs are titled with the same “Covers up to 480 sq ft” the 24-can pack uses. Read the record before you size a building on it.
  • TYTAN Professional Thermospray Sold for metal garages and sheds in the maker’s own words. Selena USA publishes a US data sheet and a safety data sheet for it on tytan.com/us, which neither the brand store nor the Amazon listing links. It is in the numbered order, held down by the highest price an ounce in the set rather than by its paperwork.

Wide spray

Foam sealants

  • Gap fillers for the penetrations Every screw line, conduit, hydrant and vent through a steel skin is an air path. Sealing those is cheap and it is the part of the job that pays back fastest.
Where foam is not the answer
  • A storage barn you are never going to heat or cool. Insulation slows heat moving between inside and outside, and if you are not conditioning the inside there is nothing to slow. The exception is condensation: if the building drips on your equipment, the first inch of foam is worth it even unheated, and that is the only reason to spray one.
  • A roof that already leaks. Foam on the underside bonds to the panel and hides the point where water is getting in, so the next leak surfaces somewhere else entirely. Chase the screws and the seams first.
  • A building you may re-skin or take down. Cured foam bonds to steel and comes off mechanically, taking the coating with it. If the panels have a life left in them and you might reuse them, that is a real cost to weigh.
  • A dirt or unsealed slab floor with a moisture problem. Ground moisture evaporating into the building is a source you cannot spray your way out of, and a vapor retarder under or on the slab comes first.

Quantity, worked once

30 ft by 40 ft building, 14 ft walls, 4:12 gable roof

Board feet are square feet times inches. The kit figures are the makers’ theoretical yields, which every maker that defines the term says are laboratory numbers; plan on less.

  1. Side and end walls: 140 ft around x 14 ft = 1,960 sq ft, less a 12 by 12 ft overhead door and a 3 by 7 ft walk door: 1,795
  2. Roof: 4:12 pitch over a 30 ft span is 15.8 ft of rafter a side, so 31.6 x 40 = 1,265 sq ft
  3. Gable ends: a 4:12 pitch over 30 ft rises 5 ft, so each triangle is 75 sq ft and the pair is 150
  4. Surface to cover: 3,210 sq ft
  5. At 2 in: 6,420 board feet
  6. Froth-Pak 630 claims 630 at 1 in: eleven kits. HandiFoam II-600 claims 601: eleven. A 24-can kit claims 480: fourteen

Eleven to fourteen kits at the makers’ own theoretical yields, before any allowance for the loss every one of them warns about. That is the number worth sitting with before you order anything. At this scale, get a contractor quote alongside it, because the comparison stops being obvious the way it is for one wall.

Run your own numbers in the calculator

Questions

Metal Buildings, answered from the records above

Do I still need a vapor barrier with spray foam in a metal building?

Usually not a separate one, and adding sheet plastic on the warm side of foam that is already low perm can trap water between the two layers. Closed cell foam at enough thickness is the vapor retarder, and the number that says so is the perm rating the maker publishes at the thickness you sprayed. HandiFoam FR prints 0.9 perm at 1 in, which its own sheet calls a Class II vapor retarder. Read that figure on your product, then ask the official what your adopted code asks for.

How thick does the foam need to be to stop condensation?

Nobody can give you one number, and be careful of anyone who does. It depends on how warm and humid you keep the inside, how cold your design temperature is, and the perm rating of the product. What is true generally is that the first inch or two does most of the condensation work and the inches after that are buying R-value. If the building will be conditioned, size the total from the energy code and treat the condensation layer as the floor, not the target.

Can I do a metal building with single-can kits?

You can, and the arithmetic above is the reason most people do not. A 30 by 40 building at 2 in, gable ends included, is 6,420 board feet, which is fourteen 24-can kits at their claimed yield and more once you allow for loss. Cans make sense for a bay or two, a shop wall, or the penetrations. For the whole envelope the canister kits are not cheaper per claimed board foot, they are roughly double, but they are the only ones whose yield figure the maker defines and they go on far faster. At this scale get a contractor quote too.

Does the foam have to be covered in a shop?

That depends on which code covers your building and how it is used, which is why the constraint above says to ask first. Where the building is a dwelling the answer is yes, a thermal barrier. Where it is not, the IBC foam plastic rules apply with their own exceptions, and some of those turn on the occupancy and the height. Exposed foam in a working shop is the case to get confirmed before you spray, not after.

From the job to the finished wall

Plan the job in five questions

  1. Where are you insulating?

    This page answers it for metal buildings. The same five questions run for every other part of the house.

  2. What will it cost?

    Board feet are the area times the thickness. Price the kits that cover them against hiring the job out.

  3. What do you need?

    A kit, the gun and cleaner it works with, something to cover what stays clean, and the gear you wear.

  4. How do you do it?

    Check the temperature, prepare the surface, spray in passes and cover the foam where people live.

  5. How long does it take?

    The sheets give a tack-free time in minutes and a full cure in hours; only some say when people can go back in.

We have not sprayed or tested any product on this page, and nothing here stands in for the label, the safety data sheet or what your local inspector tells you.